Usustain

Contact Us

Dammam Industrial Facility

Engineer :
Usustain Engineering
Project Type :
Industrial
Client :
Manufacturing Co.
Terms :
9 Months
Strategy :
GWALLS + EPS
Date :
May 22, 2026
Dammam Industrial Facility

Built in Details

A manufacturing facility in Dammam combining GWALLS structural walls with a full EPS insulation package. The result is a production environment with tightly controlled temperatures — critical for the client’s processes — achieved with far lower energy input than conventional factory construction.

  • GWALLS + EPS:Structural insulated walls with a complete EPS envelope.
  • Process Stability:Tight temperature control for sensitive manufacturing.
  • Fire Safety:Certified fire test reports for all wall systems.
  • Energy Efficiency:Substantially lower HVAC energy than conventional factories.
  • Expandable Design:Envelope designed for future production line extensions.
7,200m² floor area
2 production halls
9 months to deliver
-30% HVAC energy

Sustainable Result

The facility demonstrates that industrial sustainability is a competitive advantage — lower energy costs, stable production conditions and a building designed to serve the client’s growth for decades.